Skip to content
Home Renovations Villa and home renovations in Benahavís

PERA Construct · Costa del Sol

Villa and home renovations in Benahavís

A villa renovation requires coordination beyond the visible finishes. We review connections between floors, installation routes and material access to prepare a proposal around the needs of the property.

Underfloor heating circuits installed before the floor is covered
Installation detail from the PERA Construct gallery.

What to review before renovating a villa

In a property with several floors, changing a bathroom can affect the ceiling below or the route of water pipes. Before defining demolition, it is useful to understand how rooms connect and which areas will remain in use. We also identify items to retain so their protection can be planned.

Access to the plot, unloading space and development conditions affect the organisation of work. Tell us about entry restrictions, working hours or requirements for removing debris. These conditions need to be considered when planning the project.

Bathrooms and plumbing as one coordinated job

When renovating a bathroom, we consider pipes, drains, substrates and finishes together. A replacement bath or concealed tap needs compatible components and suitable access for installation and future maintenance. Choosing a product by its external dimensions alone may not be enough.

See our bathroom renovation service and plumbing services. Repairs can be assessed together with reinstatement of the affected finishes.

Flooring and underfloor heating

If you want water underfloor heating, the available floor depth, insulation, circuits and connection to the heat source need review. The finished height affects doors, steps and junctions with rooms that are not being renovated.

Removing the floor finish and removing layers underneath should be separate items in the scope. Before pricing, we assess what substrate can remain and what preparation it needs. The solution is specified for the individual property.

A complete renovation or work in stages

We can assess a complete home renovation or work by area. If the property will remain occupied, explain which bathroom, kitchen or entrance must stay available. Keeping these services in use may change the work sequence.

Owners living abroad should nominate someone to approve selections and changes. Decisions about sanitaryware, taps and finishes need to fit product lead times and installation stages.

Information to prepare for a site visit

  • The property location in Benahavís and access arrangements.
  • General photographs and close-ups of the areas to be changed.
  • Available plans and approximate measurements.
  • Priority work and items you want to retain.
  • Whether the property will be occupied and your preferred timing.

This information helps us review the initial scope and the next step. Our quotation checklist explains how to organise work items and compare proposals.

Frequently asked questions

Do you undertake smaller renovations in Benahavís?

Yes. We can assess bathrooms, kitchens, flooring, plumbing or a wider renovation. Tell us which areas are affected so we can review the work.

Can you quote from photographs alone?

Photographs help with the initial review. Measurements, hidden installations and site access may require a visit before a final quotation can be agreed.

Can planning start before I travel to Spain?

We can review photographs, plans and priorities remotely. The site visit, measurements and material selections are coordinated before confirming the final scope.

Tell us about your renovation

Send the location, photographs and a description of the work. We will review the information and discuss the next step.

+34 605 636 065 · info@peraconstruct.es